Thank You!

We got your completed paperwork! If you haven't already received your copy via email, it will arrive shortly.

In the meantime, here are the next steps of the installation process.

What are my next steps?

What happens now? Here are the next steps on the road map to solar.

01 SITE SURVEY

One of our technicians will need to get on-site to take pictures and measurements required to create your custom system design.

02 ENGINEERING

With the site survey information, we are now ready to design your system and send it out for approval by you and local permitting jurisdictions

03 INSTALLATION

After design approval and permits are received, one of our certified crews will be out to install the solar, according to the plans.

04 INSPECTION

There may be a few inspections along the way, depending on the requirements of your plan. In any case, once the installations has been completed, a final inspection is always required by the city, county and/or state.

05 METER SWAP

The last step after the final inspection is passed, is to have your local utility company install your net bi-directional meter and give permission to operate (PTO).

06 MONITORING

Once the meter has been swapped, we will contact you to confirm everything is on, and teach you how to monitor your production.

Idaho

Big Dog Solar
620 Pheasant Ridge Dr. Pocatello, ID 83201
(800) 291-SOLAR

Big Dog Solar
1190 W Taylor Suite 104 Meridian, ID 83642
(208) 254-2561

Colorado

Big Dog Solar
489 28 1/2 Rd. Grand Junction, CO 81501
(970) 875-6202

Corporate

support@bigdogsolar.com
620 Pheasant Ridge Dr.Chubbuck, ID 83202
(800) 291-SOLAR