In the meantime, here are the next steps of the installation process.
What are my next steps?
What happens now? Here are the next steps on the road map to solar.
01 SITE SURVEY
One of our technicians will need to get on-site to take pictures and measurements required to create your custom system design.
02 ENGINEERING
With the site survey information, we are now ready to design your system and send it out for approval by you and local permitting jurisdictions
03 INSTALLATION
After design approval and permits are received, one of our certified crews will be out to install the solar, according to the plans.
04 INSPECTION
There may be a few inspections along the way, depending on the requirements of your plan. In any case, once the installations has been completed, a final inspection is always required by the city, county and/or state.
05 METER SWAP
The last step after the final inspection is passed, is to have your local utility company install your net bi-directional meter and give permission to operate (PTO).
06 MONITORING
Once the meter has been swapped, we will contact you to confirm everything is on, and teach you how to monitor your production.